Muck Away Croydon

Viridor Waste Management

[minti_iconbox iconimg=”17295″ style=”4″ title=”Demolition” url=”http://matthewsgroup.co.uk/demolition/”][/minti_iconbox]
[minti_iconbox iconimg=”17298″ style=”4″ title=”Earthworks & Enabling Contracts” url=”http://matthewsgroup.co.uk/earthworks-and-landscaping/”][/minti_iconbox]
[minti_iconbox iconimg=”17301″ style=”4″ title=”Haulage” url=”http://matthewsgroup.co.uk/haulage/”][/minti_iconbox]
[minti_iconbox iconimg=”17299″ style=”4″ title=”Muck Away & Waste Disposal” url=”http://matthewsgroup.co.uk/muck-away-waste-disposal/”][/minti_iconbox]
[minti_iconbox iconimg=”17303″ style=”4″ title=”Plant Hire” url=”http://matthewsgroup.co.uk/plant-hire/”][/minti_iconbox]
[minti_iconbox iconimg=”17376″ style=”4″ title=”Soil Remediation & Validation” url=”http://matthewsgroup.co.uk/soil-remediation-sussex/”][/minti_iconbox]
[minti_headline size=”fontsize-m” weight=”fontweight-400″ lineheight=”lh-13″ transform=”transform-uppercase” margin=”10px 0 0 0″]Muck Away & Waste Disposal • Demolition • Earthworks & Enabling Contracts • Haulage • Plant Hire • Soil Remediation & Validation[/minti_headline][minti_headline size=”fontsize-l” weight=”fontweight-800″ margin=”0 0 10px 0″]Call us now on 01293 617014[/minti_headline]
[minti_imageslider ids=”16946,16945″]
[minti_headline type=”h3″ size=”fontsize-l” color=”#f36e32″ weight=”fontweight-600″ transform=”transform-uppercase” align=”align-left”]Client: Viridor Waste Management[/minti_headline][minti_headline type=”h3″ size=”fontsize-m” color=”#0b4855″ weight=”fontweight-600″ align=”align-left” margin=”0 0 0px 0″]Value: Confidential at present
Start Date: March 2010[/minti_headline][minti_headline type=”h3″ size=”fontsize-m” color=”#0b4855″ weight=”fontweight-600″ align=”align-left” margin=”0 0 10px 0″]Award: March 2010 by Viridor Waste Management: Site, Beddington Lane, Croydon.[/minti_headline]

Background

Excavation of 250,000 m3 of engineering clay at Beddington Lane, haulage to Horton Land Fill site in West Sussex and placement as final capping.

The Works

This contract will be undertaken over two seasons, 2010 and 2011 involving and using two 35 tonne excavators loading 40 tipper trucks with two dozers and a self propelled compactor along with our site management staff placing the material to rigid and exacting specifications.

The contract also involves moving a further 150,000m3 of soils and clays with dump trucks on site at Hotrton to prepare the last waste cells; this part of the contract also includes the extensions to the existing drainage systems and working with in the existing methane gas extraction wells and associated pipe work infrastructure. Material arising from the new cells is being used as final restoration soils to complete the restoration of the land fill site.

[minti_imagebox style=”2″]

Call us now on 01293 617014 to discuss a project

[minti_spacer height=”15″]

[minti_button link=”mailto:[email protected]” size=”large” target=”” lightbox=”false” color=”color-2″ icon=”fa-chevron-right” appear=”true”]Email Us Here[/minti_button]

[/minti_imagebox][minti_divider style=”2″ margin=”0 0 40px 0″][minti_imagebox]

Click below to view more Recent Projects

[minti_spacer height=”4″]

[minti_button link=”http://matthewsgroup.co.uk/case-studies/” size=”large” target=”” lightbox=”false” color=”color-3″ icon=”fa-chevron-right” appear=”true”]View Recent Projects[/minti_button]

[/minti_imagebox]

No Comments

Sorry, the comment form is closed at this time.